Project : MTRC 902 Description : NAM FUNG TUNNEL AND VENTILLATION BUILLDING Employer : MTRC Client : Nishimatsu Construction Company, Kingsley Engineering limited. Installation of Sheet membrane, water stop and drill install anchors. Total Areas : 8,000m2 Country : Hong Kong Duration : Jan.2014— Oct. 2014
Project : HY/2013/12 Description : Tuen Mun-Chek Lap Kok Link Northern Connection Toll Plaza & Associated Works. Employer : CEDD Client : CRBC-Kaden Joint Venture, Siu Fai Engineering Limited & Kingsley Specialist Engineering Limited. Installation of Sheet membrane, water stop and drill install anchors. Total Areas : 7,800m2 Country : Hong Kong Duration : Mar.2015—Feb. 2016
Project : CV/2013/08 Description : Liantang/Heung Yuen Wai Boundary Control Point Employers : CEDD Main Contractor : CRBC-Kaden Joint Venture, Siu Fai Engineering Limited & Kingsley Specialist Engineering Limited. Installation of Sheet membrane, water stop and drill install anchors. Total Areas : 58,000m2 Country : Hong Kong Duration : Mar.2017—Feb. 2018
Project : NE/2016/01 Description : Development of Anderson road Quarry site- Investigation, Design and Construction. Employer : CEDD Client : Chun Wo-STEC-Vasteam JV, Kingsley Engineering limited. Installation of Sheet membrane, water stop and drill install anchors. Total Areas : 8,900m2 Country : Hong Kong Duration : June.2019— ongoing.
Previous
Next
Spray Membrane for External Surface of Wall & Roof
Project : 148/10-P1 Description : AL RAS Al AKHDAR AND BAYNOONAH STREET UPGRADING AND TRAFFIC IMPROVEMENT (PACKAGE 1 & 2 ) Employer :Department of transports (D.O.T.) Client : Al Naboodah Contracting Group LLC Supply & Installation of T-Lock membrane , water stop and Re-injection system on joints. Total Areas : 35,500m2 Country : Abu Dhabi, U.A.E. Duration :April 2011— Feb.2013
Project : Contract No. C2011/085 Description : Bridge Deck & Top of Base slab Waterproofing Employer :Doha Department of Transport Client :Consolidated Contractors Group – Teyseer Contracting company L.L.C. Qatar Total Areas : 210,000 m2 Duration : Mar. 2013- Dec. 2014
Project : RTC/081/2013 Description : RED LINE SOUTH METRO PROJECT & RED LINE NORTH METRO PROJECT Employer :Qatar Diar Vincy Construction(QDVC) Qatar Rail Client :Universal Roofing Co.WLL Supply & Installation of T-Lock membrane , water stop and Re-injection system on joints. Total Areas : 55,600m2, Country : Doha, Qatar Duration : Nov.2015-Dec.2017
Project : RTC/081/2013 Description : RED LINE SOUTH METRO PROJECT & RED LINE NORTH METRO PROJECT Employer :Qatar Diar Vincy Construction(QDVC) Qatar Rail Client :Universal Roofing Co.WLL Supply & Installation of T-Lock membrane , water stop and Re-injection system on joints. Total Areas : 55,600m2, Country : Doha, Qatar Duration : Nov.2015-Dec.2017
Previous
Next
Roof Waterproofing Membrane
Project : CP 682/1 Description : Doha North Seghers Treatment & Associated Works Employer : State of Qatar Drainage affairs Client : Keppel Seghers, Wai Fung Engineering W.L.L. Total Areas : 24,340 m2 Duration : Sep 2010 – Mar 2011
Project : CV/2013/08 Description : Liantang/Heung Yuen Wai Boundary Control Point-BCP buildings & Facilities Employer : CEDD Client :Leighton Asia Limited/ Astel Total Areas :32,500 m2 Duration : July 2018-Nov2019
Project : CP 682/1 Description : Doha North Seghers Treatment & Associated Works Employer : State of Qatar Drainage affairs Client : Keppel Seghers, Wai Fung Engineering W.L.L. Total Areas :7,500 m2 Duration : Sep 2010 – Mar 2011
Project : Centrestage Roof top Description : Renovation of the Top floors Employer : Ganter Client : Advanced Watertight Solutions limited (AWS) Total Areas :1,250 m2 Duration :Oct 2019- Dec 2019
Previous
Next
Cut & Cover , Basement waterproofing
Project : 148/10-P1 Description : AL RAS Al AKHDAR AND BAYNOONAH STREET UPGRADING AND TRAFFIC IMPROVEMENT (PACKAGE 1 & 2 ) Employer :Department of transports (D.O.T.) Client : Al Naboodah Contracting Group LLC Supply & Installation of T-Lock membrane , water stop and Re-injection system on joints. Total Areas : 53,500m2 Country : Abu Dhabi, U.A.E. Duration :April 2011— Feb.2013
Project : RTC/081/2013 Description : RED LINE SOUTH METRO PROJECT & RED LINE NORTH METRO PROJECT Employer :Qatar Diar Vincy Construction(QDVC) Qatar Rail Client :Universal Roofing Co.WLL Supply & Installation of T-Lock membrane , water stop and Re-injection system on joints. Total Areas :15,540m2 Country : Doha, Qatar Duration : Nov.2015-Dec.2017
Previous
Next
Building Basement Waterproofing
Project : Energy City Emad Tower, Lusail Development Contractor : Navayuga Engineering Company limited Client : Universal Roofing Co. WLL Total Areas :12,600m2 Country : Doha, Qatar Duration : Feb 2017- Nov. 2017
Project : RTC/081/2013 Description : RED LINE SOUTH METRO PROJECT & RED LINE NORTH METRO PROJECT Employer :Qatar Diar Vincy Construction(QDVC) Qatar Rail Client :Universal Roofing Co.WLL Supply & Installation of Sheet PVC membrane, water stop and Re-injection system on joints. Total Areas :236,600m2 Country : Doha, Qatar Duration : Nov.2015-Dec.2017
Previous
Next
Bridge-Deck Waterproofing
Project : F2 Bridge to labour camp Description : Execution of bridges to service the labour city in mafraq area the interchange Employer : Department of Transport Client :Al Jaber Trans & Cont LLC Total Areas : 6,000 m2 Duration :July 2012 – Sep 2012
Project : F1 Bridge to labour camp Description : Execution of bridges to service the labour city in mafraq area the interchange Employer : Department of Transport Client :Al Jaber Trans & Cont LLC Total Areas : 8,000 m2 Duration :July 2012 – Sep 2012
Previous
Next
Treatment of wet/dry cracks
Project : CP-10 Description : Drainage Structure Employer : New Doha Airport authority (NDIA) Client : Sinohydro – Gamuda – WCT Joint Venture Total Areas : 9,500 Lm Duration : Dec 2010 – Nov. 2011
Project : CP-10 Description : Repair of Surface cracks. Employer : New Doha Airport authority (NDIA) Client : Sinohydro – Gamuda – WCT Joint Venture Total Areas : 25,000 Lm Duration : Dec 2010 – Nov. 2011
Project : Ras Laffan Ship repair yard Description : Repair of wet cracks and concrete treatment Employer : Nalilat Client : Daewoo E & C , Ras Laffan Ship repair yard, Qatar Total Areas : 5,555 Lm Duration : Oct 2010 - Jan 2011
Project : Marine Yacht club Description : Repair of Leakage basement Employer : Kerry Properties, Hong Kong Client : Kingsley Specialist Engineering Limited Duration :Mar 2020- April 2020
Previous
Next
Flooring
Project : CP682/1 Description : Supply & Installation of floor epoxy coating on paln & machine rooms, work shop, thermal drying plan. Employer : Keppel Seghers, Wai Fung Engineering W.L.L Client : State of Qatar Drainage affairs Total Areas : 11450m2 Duration : Sep. 2010 - Mar. 2011
Project : C2604 Description : Installation floor K-Screed for Hotel tower Employer : Wynn Palace Client : Leighton Asia Limited, Kingsley Specialist Engineering limited. Total Areas : 90,000 m2 Duration : Nov. 2014- Feb. 2017
Project : C2604 Description : Installation self levelling on hotel tower & Podium Level Employer : Wynn Palace Client : Leighton Asia Limited/ Kingsley Specialist Engineering Limited Total Areas : 12,500 m2 Duration : Nov. 2014- Feb. 2017
Project : Centrestage Description : Renovation of the Top floors Employer : Ganter Client : Advanced Watertight Solutions limited (AWS) Total Areas : 1,450 m2 Duration : Oct 2019- Dec 2019
Project : C2604 Description : Installation self levelling on hotel tower Employer : Wynn Palace Client : Leighton Asia Limited/ Kingsley Specialist Engineering Limited Total Areas : 12,500 m2 Duration :Nov. 2014- Feb. 2017
Previous
Next
Cladding
AWS provides cladding installation services in buildings. Some of our works includes The Peak Galleria and New Word Center in Hong Kong. Through our wide range of technical proficient resources we can deliver quality workmanship to meet project specifications.
Previous
Next
Crack Injection
AWS specializes in crack repair works in all kinds of building and civil infrastructures works. Our key strength lies in identifying the nature of cracks in different environmental conditions and tailoring our repair techniques suitable to the site conditions. With right material choice and methods, we have proven track record of repair works done successfully in both marine environment and underground structures. Our specialty covers treatment of surface cracks, deep structural cracks and wet cracks by method of crack injection.
Previous
Next
Scaffolding Project
Project : MTRC 902 Description : Nam Fung Ventillation building Employer : MTRC Client :Nishimatsu Construction Company, Erection & Dismantle of lower sump pump area scaffolder platform for Waterproofing installation Duration : Feb.2014- March 2014
Project : H2634 Description : Liantang/Heung Yuen Wai Boundary Control Point-BCP building and Associated Facilities Employer : CEDD Client : Leighton Asia limited Erection and Dismantle of fasles work and working platforms Duration : June 2018 - Nov.2019
Project : H2634 Description : Liantang/Heung Yuen Wai Boundary Control Point-BCP building and Associated Facilities Employer : CEDD Client : Leighton Asia limited Erection and Dismantle of fasles work and working platforms Duration : June 2018 - Nov.2019
Project : H2634 Description : Liantang/Heung Yuen Wai Boundary Control Point-BCP building and Associated Facilities Employer : CEDD Client : Leighton Asia limited Erection and Dismantle of fasles work and working platforms Duration : June 2018 - Nov.2019
Project : H2634 Description : Liantang/Heung Yuen Wai Boundary Control Point-BCP building and Associated Facilities Employer : CEDD Client : Leighton Asia limited Erection and Dismantle of fasles work and working platforms Duration : June 2018 - Nov.2019
Previous
Next
Flooring Works
AWS undertakes flooring works like floor screeding, epoxy coating, self levelling both indoor and outdoor area.
Previous
Next
Scaffolding
AWS provides scaffolding services to any scale of projects ranging from residential to multistory commercial building works. Our cost effective and safety conscious approach has proven to be reliable solutions to meet client’s needs to cater at every stage of construction.
Previous
Next
Waterproofing
AWS has been heavily involved in executing large scale installation of Waterproofing Membrane for cut & cover tunnels and drill & blast tunnels. Our scope also covers Waterproofing basements, industrial buildings roof membrane installation, and external concrete walls epoxy coatings.
Previous
Next
Concrete Repair
AWS undertakes repair works of concrete surface exposed to various degrees of environmental exposure that have spalled due to progressive corrosion of reinforcement. We identify the flow path of any water ingress and leakage occurring in concrete structure and rectify with our expert methodology and technique for the refurbishment of old defected concrete.
We provide repair works on both above and below ground level structures, our repair method includes sealing of leak surfaces, waterproofing by applying protective coatings, concrete and masonry repair and crack and joint sealing.